- Crews install the Booster Station 3-4 pipeline in a conduit that is tunneled below Las Campanas Road
- A view of progress on construction of a Solar Facility located on the south side of the Water Treatment Plant
- Crews pump concrete into an encasement for the pipeline for Booster Station 3-4