Bid Number: 19/05/B
Status: Open
Close Date: 10/31/2018 2:00 PM
Project Manager:
Mackie Romero
(505) 955-4506
Contractor will provide all necessary labor tools, equipment and materials needed to provide on-call repair, replacement and installation of the BDD Project’s heating, ventilation and air conditioning systems.
The work shall include all preparation work needed to properly install new HVAC work or to repair or upgrade the existing HVAC systems. Work to include, but not limited to installation
of new or relocation of existing diffusers, grilles and registers; installation of all new or relocation of existing vents, flues, make-up and outside air ducts; installation of new or relocation of existing thermostats; installation of new or relocation of supply and return air ducts; installation of new or relocation of existing heating and/or cooling units; and similar, related HVAC work. Work to include balancing of HVAC systems, including heat loss/ heat gain calculations needed to provide the CFM deliveries for the areas served by the HVAC system. Furnishing of submittal data for any/all new equipment.
Link to bid document: RFB 19 5 B BDD On Call HVAC Maintenance Management